Stratum Market Research
Contact

Data Centers & AIGlobal marketUpdated

Global Data Center Backup Power Market 2026: size, data and top companies

Generac's backlog for products sold to data centers reached about $4.5 billion in October 2026, after a long-term backup generator deal with Amazon.

$2.4billion

Generac signed a long-term agreement to supply backup power generators for Amazon data centers

$553.0million

Generac's commercial and industrial segment sales rose about 28% to $553.0 million in the third quarter

$2.3billion

Cummins Power Systems sales rose 15% to $2.3 billion in the third quarter of 2026

Cummins, Caterpillar and GE Vernova all linked 2026 power generation growth to data centers, and fuel cell maker Bloom Energy raised its 2026 revenue guidance to $4.4 to $4.6 billion.

Why this market is moving now

  • Hyperscalers are locking in supply years ahead, as in Generac's Amazon deal with $2.4 billion of deliveries planned for 2027 and 2028.
  • Engine makers report data centers as the main driver of power generation sales in 2026, in the United States, China and Asia Pacific.
  • Gas turbine order books keep growing, with GE Vernova's backlog and slot reservations up from 116 GW to 122 GW in one quarter.
  • On-site fuel cell power is growing fast, with Bloom Energy revenue up 138.1% year on year in the third quarter of 2026.

Key figures

Global figures for this market, with the year each one describes. Use Cite to copy a reference to this page.

FigureValueYearCite
Generac's backlog for products to be sold to the data center market grew to about $4.5 billion by late October 2026.4.5 USD billion2026
Generac signed a long-term agreement to supply backup power generators for Amazon data centers, with initial deliveries expected to total $2.4 billion in 2027 and 2028.2.4 USD billion2026
Generac's commercial and industrial segment sales rose about 28% to $553.0 million in the third quarter of 2026, driven mainly by products sold into the global data center market.553.0 USD million2026
Cummins Power Systems sales rose 15% to $2.3 billion in the third quarter of 2026, driven mainly by power generation demand from data centers in the United States, China and Asia Pacific.2.3 USD billion2026
Caterpillar's Power and Energy segment sales rose 18% to $8.784 billion in the third quarter of 2026, with power generation growth mainly in turbines and large engines for data centers.8.784 USD billion2026
Bloom Energy, which sells on-site fuel cell power, reported record revenue of $1,235.8 million in the third quarter of 2026, up 138.1% year on year.1,235.8 USD million2026
Bloom Energy raised its 2026 revenue guidance to $4.4 billion to $4.6 billion, which would be 122% growth at the midpoint.4.4 USD billion (low end of guidance)2026
GE Vernova's gas power equipment backlog and slot reservations grew from 116 GW to 122 GW in the third quarter of 2026, and it expects at least 130 GW by the end of 2026.122 GW2026
Vertiv, a supplier of power and cooling equipment for data centers, reported third-quarter 2026 net sales of $4,313 million, up 61% year on year, with organic orders more than doubling.4,313 USD million2026
Vertiv expects full-year 2026 net sales of $14,650 million at the midpoint of its guidance, 38% organic growth on 2025.14,650 USD million2026

Calculated figures (shares, changes and prices per kilogram) are plain arithmetic on the reported values. Read how we work.

Companies to watch

Generac

Backup generator maker with about $4.5 billion of data center backlog in October 2026.

Cummins

Engine and generator maker; Power Systems sales rose 15% to $2.3 billion in the third quarter of 2026 on data center demand.

Caterpillar

Sells large reciprocating engines and turbines; Power and Energy sales were $8.784 billion in the third quarter of 2026.

Bloom Energy

On-site fuel cell supplier guiding to $4.4 billion to $4.6 billion of revenue in 2026.

GE Vernova

Gas turbine maker with 122 GW of gas power backlog and slot reservations.

Vertiv

Data center power and cooling supplier with third-quarter 2026 net sales of $4,313 million.

What the full report covers

  1. 01Executive summary
    The answer in one page: size, direction and what moves it
  2. 02Market definition and scope
    What is in and out of the global market
  3. 03Global market size, 2021 to 2025
    Historical series and growth rates
  4. 04Countries and regions
    Demand, supply and trade by country and region
  5. 05Outlook to 2031
    Base, low and high scenarios with stated assumptions
  6. 06Rules, policy and deadlines
    Regulation and programmes that change demand
  7. 07Drivers and barriers
    What accelerates or slows adoption, by customer segment
  8. 08Prices, costs and margins
    Unit economics where public data allows
  9. 09Competitive landscape
    8 to 12 company profiles with recent moves
  10. 10Opportunities and risks
    For new entrants, suppliers and investors
  11. 11Method and assumptions
    How every figure was built

Included with the full report

  • PDF report, 40 to 60 pages
  • Excel data pack
  • Ready-to-use charts
  • Method note and assumptions
  • Written to order in 5 working days
Compare the editions

Frequently asked questions

How big is the data center backup power market?

There is no official world total. Supplier data show the scale: Generac alone had about $4.5 billion of data center backlog in October 2026, and Vertiv expects $14,650 million of net sales in 2026.

Who are the largest data center backup power suppliers?

Generac, Cummins and Caterpillar supply generators and engines. Cummins Power Systems sales were $2.3 billion and Caterpillar Power and Energy sales were $8.784 billion in the third quarter of 2026.

Are data centers using gas turbines and fuel cells for power?

Yes. GE Vernova's gas power backlog and slot reservations reached 122 GW, and Bloom Energy's fuel cell revenue rose 138.1% to $1,235.8 million in the third quarter of 2026.

How fast is demand for data center power equipment growing?

Vertiv's net sales rose 61% in the third quarter of 2026, Generac's commercial and industrial sales rose 28%, and Caterpillar's Power and Energy sales rose 18%.

Which hyperscalers are signing backup power deals?

Generac signed a long-term agreement to supply backup generators for Amazon data centers, with initial deliveries of $2.4 billion in 2027 and 2028.

What is the outlook for 2026?

Bloom Energy guides to $4.4 billion to $4.6 billion of revenue in 2026, and Vertiv expects net sales of $14,650 million, 38% organic growth.

Free sample

Get a free sample of this report

We send the table of contents, two sample chapters and the method note, usually within one working day. It is free to ask.

  • Full table of contents
  • Two sample chapters
  • Method note and data outline
A market, a region or the decision you are making helps us pick the right chapters.

We use your details only to reply. See our privacy policy.

Full report $3,450Choose an edition