US EV Charging Infrastructure Market 2026: size, data and top companies

The US had 262,507 public EV charging ports at 83,527 station locations on 27 October 2026, according to the Department of Energy's Alternative Fuels Data Center. Of those ports, 79,187 are DC fast chargers. The federal NEVI program has made $4.2 billion available, and an estimated 183 NEVI-funded stations had opened by mid-2026.

Region
United States
Evidence
12 sourced figures from 3 sources
Last checked
27 Oct 2026
US public EV charging ports, year end20192023

262,507ports

Public EV charging ports in the US (27 October 2026)

83,527station locations

Those ports sit at 83,527 public station locations.

79,187DC fast ports

DC fast charging accounts for 79,187 public ports and Level 2 for 182,615.

168,388ports

The US had 168,388 public EV charging ports and 64,641 station locations at the end of 2023, the latest year on AFDC's published trend chart.

ChartUS public EV charging ports, year end
US public EV charging ports, year end050k100k150k200k2019: 75.8k ports75.8k20192020: 96.5k ports20202021: 114.7k ports20212022: 136.3k ports20222023: 168.4k ports168.4k2023

Source: U.S. Department of Energy, Alternative Fuels Data Center

Why this market is moving now

  • Congress transferred $503,756,000 of unobligated NEVI funds to other highway programs in February 2026.
  • States had obligated only $1.4 billion of the $4.2 billion NEVI total by 31 December 2025, and about 183 NEVI-funded stations had opened by mid-2026.
  • The Administration's FY2027 budget request, released 3 April 2026, proposed cancelling any remaining unobligated NEVI and CFI funds.

Key figures

Each figure names the source it came from. Open the source list below to read the quoted line.

FigureValueYearSource
The US had 262,507 public electric vehicle charging ports on 27 October 2026.262,507 ports2026U.S. Department of Energy, Alternative Fuels Data Center
Those ports sit at 83,527 public station locations.83,527 station locations2026U.S. Department of Energy, Alternative Fuels Data Center
DC fast charging accounts for 79,187 public ports and Level 2 for 182,615.79,187 DC fast ports2026U.S. Department of Energy, Alternative Fuels Data Center
The US had 168,388 public EV charging ports and 64,641 station locations at the end of 2023, the latest year on AFDC's published trend chart.168,388 ports2023U.S. Department of Energy, Alternative Fuels Data Center
The ChargePoint network lists 85,904 public ports, the most of any US network in AFDC data.85,904 ports2026U.S. Department of Energy, Alternative Fuels Data Center
The Tesla network lists 40,331 public ports in AFDC data, plus 14,573 on the separate Tesla Destination network.40,331 ports2026U.S. Department of Energy, Alternative Fuels Data Center
Electrify America lists 6,219 public ports and EVgo lists 5,317 in AFDC data.6,219 ports (Electrify America)2026U.S. Department of Energy, Alternative Fuels Data Center
FHWA has made available a total of $4.2 billion under the NEVI program since FY2022.4.2 USD billion2026Congressional Research Service
State obligations under NEVI reached $1.4 billion of the $4.2 billion available as of 31 December 2025.1.4 USD billion obligated2025Congressional Research Service
The EV States Clearinghouse estimated 183 NEVI-funded charging stations had opened across 20 states, as cited by CRS in June 2026.183 stations2026Congressional Research Service
The Consolidated Appropriations Act, 2026 (P.L. 119-75) transferred $503,756,000 of unobligated NEVI formula funds to other highway programs.503.756 USD million2026Congressional Research Service
The Administration's FY2027 budget request, released 3 April 2026, proposed cancelling any remaining unobligated NEVI and CFI funds.2026-04-03 date of request2026Congressional Research Service

Sources and method

The figures on this page come from the public sources listed below. Read how we work.

  1. U.S. Department of Energy, Alternative Fuels Data Center: Alternative Fuel Stations API: counts, ELEC public (2026-10-27)
    Quoted lines
    • Figure 1"ELEC":{"private":0,"public":262507,"total":262507,"name":"Electric"
    • Figure 2"stations":{"private":0,"public":83527,"total":83527}
    • Figure 3"level_2":{"private":0,"public":182615,"total":182615},"dc_fast":{"private":0,"public":79187,"total":79187}
    • Figure 5"ChargePoint Network":{"private":0,"public":85904,"total":85904}
    • Figure 6"Tesla":{"private":0,"public":40331,"total":40331}
    • Figure 7"Electrify America":{"private":0,"public":6219,"total":6219}
  2. U.S. Department of Energy, Alternative Fuels Data Center: U.S. Public Electric Vehicle Charging Infrastructure (2024-03)
    Quoted lines
    • Figure 4Data ranges from 139 to 168388.
  3. Congressional Research Service: Implementation of Electric Vehicle Charging Infrastructure Programs: CFI and NEVI (R48996) (2026-06-16)
    Quoted lines
    • Figure 8has made available a total of $4.2 billion to be obligated under NEVI.
    • Figure 9obligations increased to $1.4 billion of the $4.2 billion total available as of December 31, 2025.
    • Figure 10an estimated 183 NEVI-funded charging stations have opened across 20 states.
    • Figure 11transferred $503,756,000 of unobligated NEVI formula funds to other highway programs and activities.
    • Figure 12The Administration’s FY2027 budget request, released April 3, 2026, proposed the cancellation of any remaining unobligated NEVI and CFI program funds.

Companies to watch

ChargePoint

Largest US network by public ports in AFDC data, at 85,904 ports.

Tesla

Tesla network lists 40,331 public ports in AFDC data.

Electrify America

Lists 6,219 public ports in AFDC data.

EVgo

Lists 5,317 public ports in AFDC data.

What the full report covers

  1. 01Executive summary
    The answer in one page: size, direction and what moves it
  2. 02Market definition and scope
    What is in and out of the United States market
  3. 03Market size, 2021 to 2025
    Historical series and growth rates
  4. 04Outlook to 2031
    Base, low and high scenarios with stated assumptions
  5. 05Rules, policy and deadlines
    Regulation and programmes that change demand
  6. 06Drivers and barriers
    What accelerates or slows adoption, by customer segment
  7. 07Prices, costs and margins
    Unit economics where public data allows
  8. 08Competitive landscape
    8 to 12 company profiles with recent moves
  9. 09Opportunities and risks
    For new entrants, suppliers and investors
  10. 10Method and sources
    Every assumption and source, listed

Included with the full report

  • PDF report, 40 to 60 pages
  • Excel data pack
  • Ready-to-use charts
  • Method note and assumptions
  • Written to order in 5 working days
Compare the editions

Frequently asked questions

How many public EV chargers are there in the US?

The Department of Energy's AFDC lists 262,507 public charging ports at 83,527 station locations as of 27 October 2026. DC fast chargers account for 79,187 of the ports.

How fast has the US charging network grown?

AFDC's trend chart shows public ports rising from 75,808 in 2019 to 168,388 in 2023. The live count is 262,507 in October 2026.

What is the NEVI program?

NEVI is the federal formula program for EV charging along highways. The Congressional Research Service says FHWA has made $4.2 billion available since FY2022.

How many NEVI stations are open?

The Congressional Research Service cites an EV States Clearinghouse estimate of 183 NEVI-funded stations open across 20 states, in a report dated 16 June 2026.

Did Congress cut NEVI funding?

The Consolidated Appropriations Act, 2026 transferred $503,756,000 of unobligated NEVI formula funds to other highway programs, per CRS.

Which networks have the most chargers?

In AFDC data ChargePoint lists 85,904 public ports and Tesla 40,331, ahead of Electrify America (6,219) and EVgo (5,317).

Free sample

Get a free sample of this report

We send the table of contents, two sample chapters and the method note, usually within one working day. You owe us nothing for asking.

  • Full table of contents
  • Two sample chapters
  • Method note and data outline
A market, a region or the decision you are making helps us pick the right chapters.

We use your details only to reply. See our privacy policy.

Full report $3,450Choose an edition